Permanent & Temporary Applications

Ecofill aims to be the new norm in all Construction & Civil Engineering projects including residential, commercial, Industrial, infrastructure and the renewable energy sectors.

The Ecofill technology provides significant cost reductions whilst also helping developers to engage in regenerative and responsible sustainability.

Our Materials Management Plan will form the backbone of operational control, providing the ability to demonstrate materials suitability for reuse, both in terms of geotechnical performance for earthworks reinstatement and environmental compliance.

Ecofill: Build A Better Future

globe_circle_icon

Permanent

Permanent

Our products are suitable for use on virtually all permanent earthworks structures including

globe icon@2x

Trench Backfills

globe icon@2x

Adoptable roads and footpaths

globe icon@2x

Flood defences

globe icon@2x

Car parks, Loading Bays & Storage Areas

globe icon@2x

Laydown and hardstanding areas

globe icon@2x

Railway Embankments

Ecofil-Commercial-Industrial

Temporary

The Ecofill process and by its very nature is ideal in the construction & decommissioning of temporary structures such as haul roads and compounds. Typical applications and structures produced using the Ecofill process include:
globe icon@2x

Haul roads & access roads

globe icon@2x

Compounds

globe icon@2x

Working platforms (piling mats & crane pads etc)

Collaborating with our partners, Ecofill can design and build working platforms such as piling mats and crane pads which are produced to BRE 470 and/or Temporary Works Forum TWf2019: 02.

Commercial-Industrial-half

Laboratory Mix Design Study

Laboratory Mix Design Study

Material is sampled from site and tested at the laboratory. Here we have the ability to formulate a binder specific to any site / ground type and furthermore, we can achieve the following:

Optimum Binder Addition Rate: This allows us to achieve the required stiffness modulus & bearing capacity to support the trafficking & loadings that the structures will be subjected to over their design life whether temporary or permanent structures.

Unique Binder Design: If the site is contaminated, the mix design study will also demonstrate the unique and specific Ecofill binder design required. 

The binder will remediate the contaminated soil through the process of solidification or stabilisation. Contaminants will therefore either be encapsulated, have their leachability reduced to safe levels or become chemically changed therefore reducing toxicity or mobility.

Ecofill can formulate bespoke proprietary binders to the contaminants present at the job site as determined in the remediation strategy. This helps ensure that the optimum remediation outcome is obtained on a site by site basis in terms of sustainability, performance and cost.

This also ensures full environmental compliance is achieved for end use.